Negotiable
The date of payment from buyers deliver within days
Hunan
Long-term effective
2020-07-23 01:55
396
Company Profile
Hunan Yangdong Porcelain Insulators & Electric Co., LtdBy certification [File Integrity]
Contact:yangdong123(Mr.)
Email:
Telephone:
Phone:
Area:Hunan
Address:Hunan
Product name: Porcelain post insulators / Post insulator for 33kV C6-250
Material: Alumina and silica porcelain
Application: Electricity transmission and transformation
Station post insulator contains two parts: porcelain body and top bottom fitting. It is used for insulation and connection between conductive body and grounding body.
CLD produces alumina ceramic post insulator. The product mainly consisted of alumina and silica. It has high dielectric properties and great mechanical performance.
Advantages
Different glaze(brown, white and gray) , which can protect the insulator’s surface from pollution and improve strength;
Metal fittings are all made from ductile iron or malleable iron, and all fittings are hot galvanized to get zinc layer.
Examination in accordance with international standards confirms that the quality of our products is up to specification.
CLD has 500 employees and covers an area of 18000 square meters,and has 4 insulator production lines for dry process, 2 international most advanced insulator production lines for iso-static process and 1 line for composite insulator. Now CLD is the largest line post porcelain insulator manufacturers in china and the largest high-voltage post insulator manufacturer worldwide.
CLD has a group of technical and engineering people who help us keep innovating, and now CLD has 21 patents and a nation porcelain test center. So CLD can produce and test reliable products to international standards such as IEC、ANSI、BS、DIN、AS.
Applicable standard IEC |
Overall Height mm |
Creepage distance (min) mm |
Pitch Circle Diameter mm |
Cantilever strength KN |
Torsion Strength Nm |
Power Frequency Withstand |
Lighting Impulse Withstand KV |
|
Dry KV |
Wet KV |
|||||||
C6-125 |
305 |
500 |
76 |
6 |
800 |
60 |
50 |
125 |
C10-125 |
305 |
520 |
76 |
10 |
1200 |
60 |
50 |
125 |
C6-150 |
355 |
660 |
76 |
6 |
1200 |
75 |
50 |
150 |
C10-150 |
355 |
600 |
76 |
10 |
1800 |
75 |
50 |
150 |
C6-170 |
445 |
850 |
76 |
6 |
1500 |
100 |
70 |
170 |
C10-170 |
445 |
850 |
76 |
10 |
2500 |
100 |
70 |
170 |
C6-200 |
475 |
950 |
76 |
6 |
1800 |
110 |
70 |
200 |
C10-200 |
475 |
950 |
76 |
10 |
2000 |
110 |
70 |
200 |
C6-250 |
560 |
1200 |
76 |
6 |
2000 |
135 |
95 |
250 |
C10-250 |
560 |
1200 |
127 |
10 |
3000 |
135 |
95 |
250 |
Quality Control
We have QC person stay on the each production lines do to the inspection. All products must have been inspected before delivery. We do rountine inspection sample inspection and final inspection.
1. All raw material checked once it arrive our factory.
2. All pieces and logo and all details checked during production.
3. All packing details checked during production.
4. All production quality and packing checked on final inspection after finished.
FAQ
Q: How long is your delivery time?
A: The general EXW delivery time is 35-45 days after order date. Anther, if you need is FOB ,CIF or CFR delivery time, we will advise after discuss according to your order exact situation and our production schedule.
http://www.yddc.com/